Gateway Upgrade
Project overview*
| EIS status |
EIS active |
| Description |
A second Gateway Bridge and road deviation. |
| Proponent |
Department of Transport and Main Roads
|
| Location/s |
Carindale to Banyo, in Brisbane. Map |
| Local government/s |
Brisbane City Council |
| Key features |
- construction of second Gateway Bridge
- upgrade of existing road network - mostly on the existing Gateway Motorway alignment between Mount Gravatt-Capalaba Road and the Gateway Bridge
- duplication (through realignment) of the Gateway Motorway, from the Gateway Bridge north to the Nudgee Road Interchange, including a grade separated interchange for direct access to Brisbane Airport
- refurbishment of existing Gateway Bridge
|
Key environmental impact statement (EIS) documents
Project change documents
Project change application 2
Project change application 1
- Coordinator-General's report on project change (PDF, 59 kB), April 2007.
- Proponent's project change application (PDF, 923 kB), March 2007
- Figure 3.1 - Northern extension of existing Gateway Motorway alterations (PDF, 2.9 MB)
- Figure 3.2a - Kingsford Smith Drive ramps (PDF, 1.7 MB)
- Figure 3.2b - Reduced project scope (no Kingsford Smith Drive ramps) (PDF, 985 kB)
- Appendix B, Figure 1 - Mt Gravatt-Capalaba Road to Old Cleveland Road (PDF, 1.2 MB)
- Appendix B, Figure 2 - Old Cleveland Road to Cleveland Branch Rail Line (PDF, 916 kB)
- Appendix B, Figure 3 - Cleveland Branch Rail Line to Pinkenba Rail Line (PDF, 918 kB)
- Appendix B, Figure 4 - Airport Drive to Nudgee Road (PDF, 870 kB).
EIS process
Read more about the EIS process.
Austrlalian Government approval
Federal environment minister's approval of 'controlled action', subject to conditions.
* Project information supplied by proponent and subject to change.