Central Queensland Integrated Rail

Project overview*

EIS status EIS active
Description Integrated, heavy-haul rail system that will link coal mines in the Galilee and Bowen basins to eastern Queensland ports.
Proponent QR National
Location/s

The line will run from the Galilee Basin, north of Alpha, before linking with existing lines taking coal to the Port of Abbot Point near Bowen, or the Hay Point or Dalrymple Bay ports near Mackay.

Map

Local government/s
  • Barcaldine Regional Council
  • Isaac Regional Council
  • Whitsunday Regional Council
Key features
  • rail line
  • rail yards
  • lay-down areas
  • buildings
  • signals and communication equipment
  • construction camps
  • road works
Investment > $2 billion
Expected completion 2015
Jobs
  • 2500 (construction)
  • 800 (operational)

Have your say

The Coordinator-General has prepared draft terms of reference (TOR) for an environmental impact statement (EIS) for the Project. The draft TOR set out the matters QR Limited must address when preparing the EIS.

The public and state government advisory agencies are invited to comment on whether the draft TOR adequately cover all the matters the project proponent must address when preparing the EIS.

The Coordinator-General will consider your comments before finalising the TOR.

The project’s impacts on matters of national environmental significance are being assessed under a parallel process.

Comments close at 5pm on Monday 4 June 2012.

How to make a submission

1. Read the draft TOR

  • Download the draft terms of reference for EIS (PDF, 1.5 MB), or
  • view a printed copy between 7 May 2012 and 4 June 2012 at:
    • Alpha Library, Tennyson Street, Alpha
    • Bowen Library, 67 Herbert Street, Bowen
    • Collinsville Library, Council Chambers, Corner Stanley and Conway Streets, Collinsville
    • State Library of Queensland, Cultural Centre, Stanley Place, South Bank, Brisbane.

2. Comment

3. Send your comments

Send your completed comment form to one of the following:

  • Email: CQIRP@coordinatorgeneral.qld.gov.au
  • Post:

    The Coordinator-General
    C/- EIS project manager - Central Queensland Integrated Rail Project
    Significant Projects Coordination
    PO Box 15517
    City East Qld 4002 Australia

  • Fax: +61 7 3225 8282

Read more about commenting on draft TOR.

Environmental impact statement (EIS) process

Date Activity
5 May 2012 to
4 June 2012
Public consultation on draft terms of reference for EIS (PDF, 1.5 MB).
27 January 2012 Gazettal of 'significant project' declaration.
5 December 2011 Revised initial advice statement (PDF 2.7 MB) submitted.
7 October 2011 Application, including original initial advice statement, submitted.

Read more about the EIS process.

Media releases

* Project information supplied by proponent and subject to change.